|
This project consists of two new identical elementary
schools with identical educational programs. The new schools are
located on sites adjacent to existing schools, creating PreK-8 campus
environments.
The program for the building called for housing 450 students in
grades Pre-K through 4 with 15 full-sized classrooms, three special
education rooms, art, music and science rooms, an IMC, gym and cafetorium.
The program also required a plan that clustered by grade level and
provided equal access to shared facilities for the entire school
population.
As magnet schools, the two facilities are thematically different:
the core of the Shaughnessy School's program is Humanities; the
Bailey has an International focus. Prototypical components were
adapted to different site conditions and the differing themes.
| Choose
Another Elementary School | |
|