|
Following HMFH's study of it's secondary schools,
the town of Weston asked HMFH to proceed with major renovations
and additions to the high school. The non-descript main entrance
was redesigned to be more welcoming and inviting. Interior work
included extensive library improvements as well as installation
of a comprehensive technology system, renovation of food service
areas, physical education and health areas, and all classrooms.
Because the high school has an active performing arts program, there
were extensive improvements made to those facilities, which are
also used by community drama groups. The 600-seat theater was redesigned
with a higher proscenium to accommodate larger sets, an extended
stage that can be enlarged further by raising additional platforms
recessed in the floor,an improved acoustic treatment, theater lighting,
a new sound system, and replacement of the seats. The project also
included a new double-volume band room with risers and acoustic
treatment, as well as a new black box theater/dance studio.
A small-group Media Forum occupies a former auto shop and serves
as a performance and teaching space.
| Choose
Another High School Project | |
|