|
HMFH was responsible for the renovation of two
of Berklee's teaching/recital halls and the creation of a third
dedicated to the performance of synthesized music. Each performance
space is designed for a different level of ability, with different
and highly specific requirements for sound and lighting controls.
The hall for synthesized music required integrating specialized
acoustical materials and controls within what was once a formal
dining space featuring elaborately decorated vaulted plaster ceiling
and walnut wood paneling.
In addition, we completed a control room and recording
studio for the College. All of the projects were design-build efforts
with the client's choice of contractor.
| Choose
Another Higher Education Project | |
|