|
HMFH was responsible for the renovation of two of Berklee's
teaching/recital halls and the creation of a third dedicated to the performance
of synthesized music. Each performance space is designed for a different level
of ability, with different and highly specific requirements for sound and lighting
controls. The hall for synthesized music required integrating specialized acoustical
materials and controls within what was once a formal dining space featuring elaborately
decorated vaulted plaster ceiling and walnut wood paneling. In
addition, we completed a control room and recording studio for the College. All
of the projects were design-build efforts with the client's choice of contractor.
| Choose
Another Performance Center Project | |
|